PER THE HARBOR MASTER, AS OF NOON, MAY 27:

“Power is cut off to all docks. Lake level is at 534+’. Also,Mark needs some help on dock 1 and the floating break water,which sustained some damage from the 50+ winds last evening. If you are available, give him a call to see what time he will be ready for your help.

Access to docks 1 & 2 is hazardous at best, so please be cautious when venturing to those areas. Power to the docks will remain off, until the water recedes below the 532′ line. Work will continue on Dock 1 this Saturday and Sunday, weather permitting.”

 fLOOD ZONE

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s