Water levels drop and Dock 4 /Dock 5 construction starts March 21, 2016msndcyc Dock 3 is foot accessible now. Docks 1 and 2 should be also by end of week. As well as the crane pad. MDI is on the scene again so try to avoid the construction areas and remember that large trucks will be coming and going. John Lusk Share this: Share on X (Opens in new window) X Share on Facebook (Opens in new window) Facebook Like Loading...